What is a Reform or Rehabilitation Project
A Reform or Rehabilitation project contains plans and a written report, it may contain a basic health and safety study, a waste management study, detailed measurements. The plans of the current state, of the reformed state, dimensions and scale drawings. It also contains graphic memories of elements: carpentry, blacksmithing, furniture and construction details that resolve encounters, singular points, etc.
It is used to propose repairs of constructive deficiencies, changes in the distribution for aesthetic or functional reasons, modifications to improve the building energetically.
We can reform an apartment to have a contemporary aesthetic, with larger and more open spaces. We can also reform an apartment to make it healthier (with filtered ventilation and protection from radon gas). We can also make a floor with a passive house or NZEB level energy efficiency.
What does it consist of
A reform or rehabilitation project is based on the analysis of the current state and the knowledge of the client’s objectives. Once the previous previous studies are carried out, the constructive details of the proposals, the distributions and the finished proposals are made.
“With a Reform Project, the property is revalued. Constructively, aesthetically, functionally and economically�
What will the customer get?
The client obtains a project with the necessary and essential documentation so that a builder can assess the actions and execute them with precision. You can hire different types of project from a simple project to a reform project with interior design. You can also obtain construction details of specific designs and interior design work if you wish.
The client will have the processing and request of the Works Permit. The technical management part, the Facultative Management by an Architect, is always included in the project. This contemplates the indications to the builder of the proposed technical solutions and the review of the execution of the work. Likewise, if the client wishes to hire industrialists to have greater control of the work and make it more economically efficient, we could compare budgets, coordinate industrialists in the contracting phase and in the construction phase.